1. Provide tear off and replace or install over existing roofing.
2. How many layers of roof covering are installed
3. Provide materials list.
-------------------------------------------------------------------
Requirements for Inspections:
1. Provide pictures of roof deck after roof removal only.
2. Provide pictures of any replaced/repaired sheathing.
3. Provide pictures of flashing.
4. Provide pictures of Ice barrier and underlayment.
5. Provide pictures of roof covering attachment.
6. Schedule a final inspection and have all pictures available on-site.
7. #1 thru #5 pictures can be emailed to plans@nationinspect.com. If emailed, provide the permit number and the address in the subject line.